The Centurion Group, Inc.

Colorado Springs, CO

Core Business—Minor Construction

TCGI has completed 14 task orders under this contract. To include design, furnish and install a complete HVAC system for the Vehicle Maintenance Facility (VMF), Building 9714 on the STC property at Oak Ridge, TN. The facility is a 40,000 SF maintenance facility.

Current Contracts

Department of Energy, Secure Transportation Center

 

Oak Ridge, TN

Pike National Forest IDIQ Construction

 

Colorado

The project includes, but is not limited to, the following work:  Road and parking area construction and maintenance; road obliteration; trail construction, maintenance, and obliteration; clearing and grubbing; culvert installation and repair; sign installation and repair; erosion control; gate and fencing installation and repair; cattle guard installation and repair; building and utility excavation; material haul; haul and placement of riprap; minor concrete forming and finishing; and minor retaining wall construction.

Chalk Creek Abandoned Mines Removal and Reclamation.

Chalk Creek Abandoned Mines Removal and

Reclamation

 

San Isabel National Forest, CO

VA Medical Center

 

Butler, PA

TCGI completed several contracts for the VA Medical Center in Butler, PA. The following table states the work completed and the dates completed. These are all separate contracts.

TCGI replaced Water System Improvements Project at the Pine Ridge Job Corps Center – Work includes providing:

 

Materials, labor, earthwork and equipment necessary to design and construct a 50,000 Gallon Elevated Water Storage Tank 

 

Materials, labor, excavation, and equipment necessary to install temporary pipes and valves needed to connect the elevated water tower to an existing fire hydrant.

 

Labor, materials, equipment and services necessary for proper completion of the pump control

building interior electrical power and control wiring; relocation of electrical equipment from the existing pump control building; installation of a government supplied emergency electrical generator and transfer switch; and underground conduit and wiring to connect power/control circuits to the elevated water tower, siren, and well and provide electrical service to the building.

 

Material, equipment and labor necessary to remove the existing Chadron water building

 

Material, equipment and labor necessary to remove three existing 2840 gallon pressure tanks

 

Removal of 11,500 sf of  existing concrete or asphalt and shall include the saw cutting as required, removal and disposal of said materials.

 

Removal of 15 large trees

 

Removal and reset of 40LF of fence

 

Demolition of system to include: abandon 10 Fire Hydrant, 5 Water Valve Manhole and 10 Water Valve Box

 

Install new 6” and 2” water mains

 

Water  Improvement Project Pine Ridge Job Corps Center

 

Chadron, NE

La Veta Field Office Rehabilitation

 

La Veta, CO

TCGI conducted the Rehabilitation of an existing Forest Service Office Building, with historical significance, to provide handicap accessibility that compliments the building’s architecture.  Provided all labor, materials, and equipment to demolish an existing planter box and other designated items; install a new, accessible, building front entrance with walkway; install new bulletin board; relocate an existing sign; install a new flagpole; reconstruct an existing restroom; and all incidentals necessary to complete the work. Restroom included demolition, carpentry, plumbing, electrical, drywall, flooring, and painting.     

Previous Contracts

TCGI constructed 1,680 Meters of horse trail through natural forest and boulder fields. Also constructed three complete equestrian and pedestrian bridges over Geneva Creek. Includes complete concrete footers and wing walls.

Guanella Pass Horse Trail and Bridges Project

 

Grant, CO

Contract Number

DE-AT52-09NA29264, Task Order 3

Type of Contract

Fixed Price

Performance Period

Sept 2009—March 2010

Contract Number

AG-82X9-C-07-0089

Type of Contract

IDIQ

Performance Period

June 2007—Sept 2010

Contract Number

AG-82X9-C-09-0080

Type of Contract

Services , Fixed Price

Performance Period

June 2009—Sept 2010

Contract Number

 AG-82X9-C-07-0123

Type of Contract

Fixed Price

Performance Period

July  2007—Oct 2009

Contract Number

AG-82X9-C-07-0005

Type of Contract

Construction Fixed Price

Performance Period

Oct—Dec 2007

Work

Description

Dates

Value

Sewer Repair

Repair Sewers

Clean 2000 LF of 12” sewer pipe

Clean 1000 LF of 6” sewer pipe

2000 LF of 12” sewer pipe to be lined with cured in-placed pipe line

1000 LF of 6” sewer pipe to be lined with cured in-placed pipe line

25 LF of spot repair of 12” pipe 22 feet under ground

25 LF of spot repair of 12” pipe 15 feet under ground

Install five new man hole

Seal 120 ft of man hole walls

Remove and replace frame and covers of 5 ea man holes.

Sept 2006—April 2007

$ 350,000

Repair Roof, Bldg 18

Removed old roof and provided a new shingle roof on a 5,995 square foot building

Oct—Nov 2007

$ 55,000

Asphalt Work at Emergency Entrance

Raising the level of the parking lot to match the adjacent street, providing a concrete walkway between two buildings, and demolishing a current ramp and providing a handicap sidewalk that is ADA compliant

Nov 2007

$ 35,500

Repair Roof Bldg 3

Salt bin building

• Removal of existing translucent panels, Install ½” wood fiberboard insulation, Adhere 45mil EPDM.

• On the front slope, fasten a 1/2 fiberboard insulation  and adhere EPDM to the insulation.

• Install Metal Edge.

• Install Gutter and (1) Downspout  (back of bldg)

• Repair back gutter area “fur-out” with new exterior grade T-111

Nov—Dec 2007

$15,000

Bldg 5 Slate roof

Slate roof repairs to include Replace sewer vent flashing, replace missing slates, repair leaking slates, caulk ridge nails, replace 4 copper valleys on roof

July—Aug 2007

$8,000

Contract Number

DTFH68-11-C-00013

Type of Contract

 Fixed Price

Performance Period

June 2011—Oct 2011