The Centurion Group, Inc. |
|
Colorado Springs, CO |
|
Core Business—Minor Construction |
|
TCGI has completed 14 task orders under this contract. To include design, furnish and install a complete HVAC system for the Vehicle Maintenance Facility (VMF), Building 9714 on the STC property at Oak Ridge, TN. The facility is a 40,000 SF maintenance facility. |
|
Current Contracts |
|
Department of Energy, Secure Transportation Center
Oak Ridge, TN |
|
Pike National Forest IDIQ Construction
Colorado |
|
The project includes, but is not limited to, the following work: Road and parking area construction and maintenance; road obliteration; trail construction, maintenance, and obliteration; clearing and grubbing; culvert installation and repair; sign installation and repair; erosion control; gate and fencing installation and repair; cattle guard installation and repair; building and utility excavation; material haul; haul and placement of riprap; minor concrete forming and finishing; and minor retaining wall construction. |
|
Chalk Creek Abandoned Mines Removal and Reclamation. |
|
Chalk Creek Abandoned Mines Removal and Reclamation
San Isabel National Forest, CO |
|
VA Medical Center
Butler, PA |
|
TCGI completed several contracts for the VA Medical Center in Butler, PA. The following table states the work completed and the dates completed. These are all separate contracts. |
|
TCGI replaced Water System Improvements Project at the Pine Ridge Job Corps Center – Work includes providing:
Materials, labor, earthwork and equipment necessary to design and construct a 50,000 Gallon Elevated Water Storage Tank
Materials, labor, excavation, and equipment necessary to install temporary pipes and valves needed to connect the elevated water tower to an existing fire hydrant.
Labor, materials, equipment and services necessary for proper completion of the pump control building interior electrical power and control wiring; relocation of electrical equipment from the existing pump control building; installation of a government supplied emergency electrical generator and transfer switch; and underground conduit and wiring to connect power/control circuits to the elevated water tower, siren, and well and provide electrical service to the building.
Material, equipment and labor necessary to remove the existing Chadron water building
Material, equipment and labor necessary to remove three existing 2840 gallon pressure tanks
Removal of 11,500 sf of existing concrete or asphalt and shall include the saw cutting as required, removal and disposal of said materials.
Removal of 15 large trees
Removal and reset of 40LF of fence
Demolition of system to include: abandon 10 Fire Hydrant, 5 Water Valve Manhole and 10 Water Valve Box
Install new 6” and 2” water mains
|
|
Water Improvement Project Pine Ridge Job Corps Center
Chadron, NE |
|
La Veta Field Office Rehabilitation
La Veta, CO |
|
TCGI conducted the Rehabilitation of an existing Forest Service Office Building, with historical significance, to provide handicap accessibility that compliments the building’s architecture. Provided all labor, materials, and equipment to demolish an existing planter box and other designated items; install a new, accessible, building front entrance with walkway; install new bulletin board; relocate an existing sign; install a new flagpole; reconstruct an existing restroom; and all incidentals necessary to complete the work. Restroom included demolition, carpentry, plumbing, electrical, drywall, flooring, and painting. |





|
Previous Contracts |
|
TCGI constructed 1,680 Meters of horse trail through natural forest and boulder fields. Also constructed three complete equestrian and pedestrian bridges over Geneva Creek. Includes complete concrete footers and wing walls. |
|
Guanella Pass Horse Trail and Bridges Project
Grant, CO |

|
Contract Number |
DE-AT52-09NA29264, Task Order 3 |
|
Type of Contract |
Fixed Price |
|
Performance Period |
Sept 2009—March 2010 |
|
Contract Number |
AG-82X9-C-07-0089 |
|
Type of Contract |
IDIQ |
|
Performance Period |
June 2007—Sept 2010 |
|
Contract Number |
AG-82X9-C-09-0080 |
|
Type of Contract |
Services , Fixed Price |
|
Performance Period |
June 2009—Sept 2010 |
|
Contract Number |
AG-82X9-C-07-0123 |
|
Type of Contract |
Fixed Price |
|
Performance Period |
July 2007—Oct 2009 |
|
Contract Number |
AG-82X9-C-07-0005 |
|
Type of Contract |
Construction Fixed Price |
|
Performance Period |
Oct—Dec 2007 |
|
Work |
Description |
Dates |
Value |
|
Sewer Repair |
Repair Sewers Clean 2000 LF of 12” sewer pipe Clean 1000 LF of 6” sewer pipe 2000 LF of 12” sewer pipe to be lined with cured in-placed pipe line 1000 LF of 6” sewer pipe to be lined with cured in-placed pipe line 25 LF of spot repair of 12” pipe 22 feet under ground 25 LF of spot repair of 12” pipe 15 feet under ground Install five new man hole Seal 120 ft of man hole walls Remove and replace frame and covers of 5 ea man holes. |
Sept 2006—April 2007 |
$ 350,000 |
|
Repair Roof, Bldg 18 |
Removed old roof and provided a new shingle roof on a 5,995 square foot building |
Oct—Nov 2007 |
$ 55,000 |
|
Asphalt Work at Emergency Entrance |
Raising the level of the parking lot to match the adjacent street, providing a concrete walkway between two buildings, and demolishing a current ramp and providing a handicap sidewalk that is ADA compliant |
Nov 2007 |
$ 35,500 |
|
Repair Roof Bldg 3 |
Salt bin building • Removal of existing translucent panels, Install ½” wood fiberboard insulation, Adhere 45mil EPDM. • On the front slope, fasten a 1/2 fiberboard insulation and adhere EPDM to the insulation. • Install Metal Edge. • Install Gutter and (1) Downspout (back of bldg) • Repair back gutter area “fur-out” with new exterior grade T-111 |
Nov—Dec 2007 |
$15,000 |
|
Bldg 5 Slate roof |
Slate roof repairs to include Replace sewer vent flashing, replace missing slates, repair leaking slates, caulk ridge nails, replace 4 copper valleys on roof |
July—Aug 2007 |
$8,000 |
|
Contract Number |
DTFH68-11-C-00013 |
|
Type of Contract |
Fixed Price |
|
Performance Period |
June 2011—Oct 2011 |