The Centurion Group, Inc. |
|
Colorado Springs, CO |
|
Core Business—Minor Construction |
|
TCGI provided all supervision, labor and equipment to build 2.3 miles of equestrian and foot path through the Kreutzer Section of the San Isabel National Forest. The work was performed by hand at 12,000 ft elevation. The weather allowed only three to four months of work time each year during the summer. |
|
Previous Contracts |
|
Continental Divide National Scenic Trail Construction
San Isabel National Forest, CO |
|
TCGI performed a rehabilitation of the AG Ranch irrigation system that included removal of timber, installing 40 lf of culvert, installation of 3 headgates to include fabricating the concrete forms within the forested area by hand, and cleaning of over 5000 lf of ditches. |
|
AG Ranch Ditch Repair
Bailey, CO |
|
Hanger 1048 and 1418 Reconfigure
NAS JRB Fort Worth, TX |
|
TCGI was a subcontractor to Walton Construction on the reconfiguration of Hangers 1048 and 1418 located at the NAS, JRB Fort Worth. Work included demolition, installing new doors, painting all walls and doors, installing new ceiling, installing new carpet, tile floors, restroom fixtures and flooring, and installing new casework. |
|
TCGI replaced ceiling and flooring throughout the basement area. This included wrapping all chilled water pipes within the area above the ceiling.
|
|
Western State Hospital
Hopkinsville, KY |
|
FCI Englewood
Littleton, CO |
|
TCGI repaired the stucco that was falling off the exterior walls of the prison, which contained asbestos. Concrete work was done on the steps and the entire exterior of the prison was painted. Exterior perimeter road and parking lot at the temp housing area were provided a new coating of asphalt. |
|
Burning Bear Trail Bridge Repair
San Isabel National Forest, CO |
|
TCGI hauled a 22 foot 8x10 rough cut lumber 1/2 mile down the trail and replaced a rotted log that was one of the two supports for the bridge. All work done by hand. |
|
Master Agreement
Fort Campbell, KY |
|
TCGI has performed various construction projects under the Master Agreement. The tasks include: |


|
Pikes Peak Ranger Office Remodel
Colorado Springs, CO |
|
TCGI performed turned two offices into three offices. This included demolition of one wall, building two walls, installing a new door, ceilings, flooring and all electrical work associated with the new walls. |

|
Fort Leavenworth Remodel
Fort Leavenworth, KS |
|
TCGI performed on five different task orders for SKE International. |



|
Contract Number |
AG-82X9-C-07-0005 |
|
Type of Contract |
Fixed Price |
|
Performance Period |
Dec 2006—Sept 2009 |
|
Contract Number |
43-82BH-P07-0054 |
|
Type of Contract |
Construction , Fixed Price |
|
Performance Period |
Sept—Dec 2007 |
|
Contract Number |
RFB-113-08 |
|
Type of Contract |
Fixed Price |
|
Performance Period |
Jan—Mar 2009 |
|
Contract Number |
DJB40303-026 |
|
Type of Contract |
Construction Fixed Price |
|
Performance Period |
Sept 2007—June 2008 |
|
Contract Number |
Credit Card |
|
Type of Contract |
Fixed Price |
|
Performance Period |
Aug 2007 |
|
Contract Number |
W91248-07-A-0041 |
|
Type of Contract |
Fixed Price Calls |
|
Work |
Description |
Dates |
|
Counters and Walls |
Construct counters and partition walls at building A5004 |
Oct 2009 |
|
Fence |
Fence at Phone Center Building 7943 |
Oct 2009 |
|
Partitions |
Repair partitions in ballroom Building 1610 |
Sept 2009 |
|
Reset Rooms |
Reset First floor rooms and hallways Building 6754 |
Mar 2009 |
|
Walls |
Construct walls and install fire sprinklers in room 275 building 2700 |
Sept 2008 |
|
Finger guards |
Install finger guards in Child Development Center, building 3071 |
June 2009 |
|
Contract Number |
Subcontractor |
|
Type of Contract |
Fixed Price |
|
Performance Period |
Jan—Apr 2009 |
|
Contract Number |
AG-82BH-P-09-0037 |
|
Type of Contract |
Construction Fixed Price |
|
Performance Period |
June—July 2009 |
|
Contract Number |
Subcontract |
|
Type of Contract |
Construction Fixed Price |
|
Performance Period |
Feb –June 2009 |
|
Work |
Description |
Dates |
|
Walls |
Non-load bearing wall framing, drywall and finish in the Kitchen of the National Guard Armory in Leavenworth KS |
Mar 2009 |
|
Walls |
Non-load bearing wall framing, drywall and finish in the Field Latrin of the National Guard Armory in Leavenworth KS |
Mar 2009 |
|
Walls |
Non-load bearing wall framing, drywall and finish in the facility support area of the National Guard Armory in Leavenworth KS |
Apr 2009 |
|
Walls |
Non-load bearing wall framing, drywall and finish in the CP training facility of the National Guard Armory in Leavenworth KS |
Mar 2009 |
|
Floors |
Flooring in bldg 339 at Fort Leavenworth, KS |
Feb 200 |