

|
The Centurion Group, Inc. |
|
Colorado Springs, CO |
|
Core Business—Facility Maintenance |
|
At St Gabriel the Archangel Catholic Church in Colorado Springs, CO, TCGI performs complete facility maintenance. The services include janitorial services, maintenance and repair of electrical, HVAC, fire alarm and fire suppression systems, irrigation and plumbing systems, grounds maintenance in the summer and winter. |
|
Previous Contracts |
|
St Gabriel the Archangel Church
Colorado Springs, CO |
|
Dyess AFB
Abilene, TX |
|
TCGI performs the Military Family Housing and Dormitory Maintenance at Dyess AFB in Texas for the US Air Force. Services include project management, maintenance management, service call maintenance that involves services to electrical, plumbing, sanitary waste, and HVAC systems, change of occupancy maintenance (COM) that includes recurring equipment maintenance, recurring exterior facilities maintenance, carpentry repairs as necessary and all interior and exterior painting for 400 family housing units and 808 dormitory rooms. |
|
HVAC maintenance and repair was performed by TCGI in various buildings on Peterson AFB in Colorado for the US Air Force. A total of twenty seven chillers and nine boilers were serviced. |
|
Peterson AFB
Colorado Springs, CO |

|
VA Medical Center
Butler, PA |
|
In Butler, PA TCGI installed an exhaust duct for a sterilizer and a supplemental exhaust fan for the Department of Veterans Affairs at their Veterans Administration Medical Center. |
|
Heat Exchanger Project: TCGI provided all construction materials, equipment, supervision and labor to replace two (2) existing heat exchangers in Bld 46 and one (1) in Bld 27, replace six (6) valves in Bld 46 and install a new pump, piping and valves in Bld 46. |
|
VA Medical Center
Boise, ID |


|
Pine Ridge Job Corps
Chadron, NE |
|
HVAC Remodel Contract at Pine Ridge Job Corps. TCGI provided removal and disposal of existing HVAC units, and associated ductwork, registers, grilles, controls, gas piping, and electrical components; installation of new HVAC units, associated ductwork, registers, grilles, controls, gas piping, and electrical components; cutting and patching openings for new duct routing including roof repair for roof curb replacement; and HVAC system cleaning. removal and disposal of the existing domestic water heaters and installing new domestic water heaters including piping and insulation for hot and cold water hookup, gas pipe hookup and new intake and combustion air flues. cleaning interior surfaces of the existing air distribution system |

|
TCGI has performed various facility maintenance projects under the Master Agreement. The tasks include: |
|
Master Agreement
Fort Campbell, KY |

|
VA Medical Center
Phoenix, AZ |
|
TCGI performed repairs to the Smoke and Fire Barriers and electrical circuit tracing throughout the medical center. |
|
The work included, all materials, labor, and items necessary to convert the existing electric services to a gas service in unit #110 & #112 at the Shadow Mountain Village. This included installing two forced air gas units and installing new electric radiant heat in the attics and the garages. Included demolition of all the existing units and installing all new duct systems. |
|
Shadow Mountain Village Heat Conversion Project
Granby, Co |


|
Contract Number |
Maintenance Agreement 01 |
|
Type of Contract |
Services, Fixed Price |
|
Performance Period |
Dec 2004—June 2008 |
|
Contract Number |
FA4661-06-D-0001 and 08-D-0001 |
|
Type of Contract |
Services Fixed Price |
|
Performance Period |
Oct 2005—Sept 2009 |
|
Contract Number |
FA2517-08-P-5022,5033, 5039 |
|
Type of Contract |
Services , Fixed Price |
|
Performance Period |
May 2008—Oct 2008 |
|
Contract Number |
529C85029 |
|
Type of Contract |
Services Fixed Price |
|
Performance Period |
Sept—Nov 2007 |
|
Contract Number |
V260C-00053 |
|
Type of Contract |
Fixed Price |
|
Performance Period |
June 2006—July 2007 |
|
Contract Number |
AG-82X9-C-07-0025 |
|
Type of Contract |
Services Fixed Price |
|
Performance Period |
Feb—Jul 2007 |
|
Contract Number |
W91248-07-A-0041 |
|
Type of Contract |
Fixed Price Calls |
|
Contract Number |
644C 71391 |
|
Type of Contract |
Services Fixed Price |
|
Performance Period |
Oct 07—Feb 08 |
|
Contract Number |
AG-82X9-C-09-0264 |
|
Type of Contract |
Fixed Price |
|
Performance Period |
Sept—Nov 2009 |
|
Work |
Description |
Dates |
|
Sign |
Installed an addition to the existing sign building 6896 |
Aug 2009 |
|
Water Lines |
Hot and Cold water lines installed in Bldg 6919 |
June 2009 |
|
Carpeting |
Replaced Carpeting Bldg 6901 |
July 2008 |
|
Purge Units |
Replaced Trane Purge Units buildings 3902 and 6921A |
July 2008 |
|
Air Handler |
Replaced Air Handler Unit at Bldg 6989 Mini Mall |
June 2007 |
|
Chiller |
Replaced chiller unit at troop housing building 7094 |
Sept 2007 |